Site Readiness Checklist Before a Robot Arrives

Published: Publisher: Zhilianhai Robotics News

Physical readiness

  • Floor flatness and load rating verified for the cell base and any crane path.
  • Clearance for maintenance access behind and above the robot, not just the working side.
  • Delivery route measured: door widths, turning radii, forklift capacity and lift height.

Utilities

UtilityTypical requirementCheck before order
PowerDedicated circuit, correct voltage and earthingPanel spare capacity and breaker type
Compressed airDry, filtered, stable pressure at the cellPipe size and drain point
NetworkSwitch port and fixed IP or DHCP reservationCable route and cabinet space
CoolingCabinet ventilation or chiller for high-duty cellsAmbient temperature in summer

People and process

Name the operators, the maintenance technician and the safety officer before installation. A robot that arrives without a named owner spends its first month being unboxed by whoever is available. Agree the run-in hours, the shift pattern for the trial and who can stop the cell.

Hand this checklist to the integrator as a document, not a conversation. Anything not on paper becomes a change order.

This article is published by the Zhilianhai Robotics News site. Where policies, standards, prices, company capabilities or project status are involved, cross-check the original sources as well.

Back to section

Company information

Company information in this section comes from the Zhilianhai company database. To add or correct company data, go to Company Directory to look up the company, or submit a data verification request via Contact Us; once the company data upload channel opens, this module will handle it.

Latest materials in this section

Discussion and comments