Preparing the published article.
How to Post a Robot Requirement
A template that gets useful responses.
What to include
| Field | Example |
|---|---|
| Task | Machine tending for four lathes |
| Part | 3.5 kg, up to 320 mm, arrives oily |
| Cycle | 45 seconds per part including door |
| Environment | 5–38 °C, chips and coolant mist |
| Interfaces | Legacy machines, start/done signals only |
| Target | Include guarding, training, 12-month warranty |
Then check
- Could a supplier judge feasibility from this alone?
- Is every acceptance figure measurable?
- Is a budget range stated? A range dramatically improves response quality.

