Acceptance Testing Checklist for a Robot Cell
Acceptance is the moment to test, not the moment to hope.
Test before you sign
| Area | What to test |
|---|---|
| Function | Every operating mode and recovery routine |
| Cycle time | Measured over a sustained run, not a single cycle |
| Quality | First pass yield at the agreed sample size |
| Safety | Stops, interlocks and guards verified and recorded |
| Documents | Programs, parameters, spare list and training delivered |
| Handover | Operator and maintenance training completed |
How to run the test
- Agree the test plan and acceptance criteria in advance.
- Record the run data and keep signed copies.
- List any open defect with an owner and a date.
Acceptance criteria belong in the contract so that both sides test against the same measures.