Skip to main content
Unified search: articles, nationwide company names, and robot categories (separate module)
Section content

Mothballing a Robot Cell and Restarting It

Published: Publisher: Zhilianhai Robotics News

Before shutdown

ItemAction
IsolationLock off and tag the supply to prevent accidental energising
MoistureDesiccant in the cabinet, or periodic power-up to drive out damp
ProtectionRust preventative on guideways and covers over the machine
RecordsNote the shutdown date and the stored condition

Restart sequence

  • Check the environment and the cabinet for moisture or foreign objects.
  • Jog each axis at low speed and listen for unusual noise or binding.
  • Verify zero positions and safety functions before automatic operation.
  • Increase inspection of the first production batch to confirm accuracy.

After a long shutdown, a full inspection by the manufacturer or an integrator is advisable.

This article is published by the Zhilianhai Robotics News site. Where policies, standards, prices, company capabilities or project status are involved, cross-check the original sources as well.

Back to section

Company information

Company information in this section comes from the Zhilianhai company database. To add or correct company data, go to Company Directory to look up the company, or submit a data verification request via Contact Us; once the company data upload channel opens, this module will handle it.

Latest materials in this section

Discussion and comments