Site Readiness Checklist Before Delivery

Published: Publisher: Zhilianhai Robotics News

Before the equipment arrives

ItemCheck
PowerCapacity, isolation point and protection installed
AirPressure, flow and quality verified
FloorLevel, load capacity and fixing method confirmed
AccessRoute, door widths and lifting equipment arranged
EnvironmentDust, temperature and humidity within specification
PeopleOperators and maintenance staff available for training

How to use the checklist

  • Walk the checklist with the integrator a month before delivery.
  • Photograph any deviation and agree the remedy and owner.
  • Do not accept delivery into an unfinished area unless unboxing is agreed.

Site readiness requirements come from the equipment documentation. Confirm them with the supplier.

This article is published by the Zhilianhai Robotics News site. Where policies, standards, prices, company capabilities or project status are involved, cross-check the original sources as well.

Back to section

Company information

Company information in this section comes from the Zhilianhai company database. To add or correct company data, go to Company Directory to look up the company, or submit a data verification request via Contact Us; once the company data upload channel opens, this module will handle it.

Latest materials in this section

Discussion and comments