Preparing the published article.
Coordinating Design Reviews Across Partners
Reviews that happen separately produce interfaces that do not fit.
How to run joint reviews
| Stage | Purpose |
|---|---|
| Concept review | Agree the architecture and interfaces |
| Detailed review | Check drawings, tolerances and signals against the interface list |
| Pre-build review | Confirm readiness before manufacturing |
| Pre-delivery review | Verify documents, spares and training |
Practical measures
- One shared agenda and one set of minutes.
- Every action with an owner and a date.
- Re-verify interfaces after any change.
Interface registers should be signed by both partners before manufacturing starts.

